In late August we brought in more soil/rock to fill the site as it was still too low. There were at least 7 truckloads of new dirt brought in, plus several truck loads of base rock. The new soil was placed in the kennel area and then leveled off in preparation for the pier hole digging. The site didn't stay this "clean" for long.