The driveway curb has been poured and the base rock has been brought in. It is now awaiting to be placed under the asphalt.
An updated shot of the building after the stucco was complete. The white coloring on the stucco makes the building look very bright. Soon it will look different when the true colors will be painted on.
The electrical lines were placed underground and now have to be pulled into the building. It is quite difficult to pull so many lines into the building at once.